The two 200-ton four-girder casting overhead cranes manufactured by our factory contributed to the complete success of the hot commissioning.
This project involves a total of eight high-tonnage, four-girder bridge cranes designed and manufactured entirely by our company. Among them, the 200-ton four-girder bridge crane is specifically designed for transporting fully loaded molten steel ladles for refining operations; it features precise speed regulation and high-efficiency performance. By utilizing sensor-based monitoring and control technologies, the crane enables fault detection and control, thereby assisting smelting enterprises in optimizing production processes, achieving intelligent control, and realizing low-carbon production.